Fabrication & installation Β· Columbus, Ohio

We cut the stone ourselves

Every countertop we sell is templated, cut, polished and installed by our own shop on Bridgeway Avenue. No subcontractors. No middleman markup. One company on the phone from first measurement to final walkthrough.

Slab layout drawingA 126 by 63 inch slab with three countertop pieces nested inside, a sink cutout, the seam location between the back run and the return, and the leftover area marked as a remnant. 126" 63" A BACK RUN Β· 98" Γ— 25Β½" SINK CUTOUT 33" Γ— 19" B RETURN Β· 62" Γ— 25Β½" C 36" Γ— 25Β½" REMNANT SEAM Β· A βˆ• B JOINT PLACED AWAY FROM THE SINK VEIN DIRECTION
Fabricating since
1994
Shop & slab yard
62,000 ftΒ²
Template to install
10 days
Slabs on the floor
1,000
What fabricator-direct means

You are buying from the shop that runs the saw

There are three ways to buy a countertop in Columbus. A big box store sells you a package and hands the work to a fabricator you never meet. A standard countertop shop cuts the stone itself but orders your slab in from a distributor's yard. We hold a thousand slabs on our own floor and cut every one of them here.

Three ways to buy a countertop in Columbus
  Big box store Standard countertop shop Distinctive Kitchen
Who cuts your stone A subcontracted fabricator you never meet Their own shop, usually one crew Our own shop, running five to ten installs a day
Choosing the slab A sample chip on a display board Photos of slabs held at a distributor's yard Walk a thousand slabs on site and tag yours
Pricing A package price, hard to itemise Quote on request Published per square foot, online, before you call
Edge profiles Basic edge included, the rest cost extra Ogee and bevel usually carry an upcharge All six profiles, no upcharge on any of them
Seam placement Decided in a shop you never speak to Decided at the saw, after you have paid Shown on a photo of your slab for approval first
Minimum job Package minimums apply Commonly 25 to 40 square feet None β€” a single vanity is a real job here
Lead time Several weeks, set by the subcontractor's queue Depends on when the slab arrives About ten days when your slab is on our floor
If something is wrong The store, then the subcontractor, then back again Depends who picks up the phone The crew that built your tops comes back

Breton builds much of the stone-processing equipment this industry runs on. They named our Columbus facility their North American showroom.

Route through the shop

Template to installed in about ten days

That is the schedule when your slab is already on our floor and the cabinets are ready on template day. Special orders, heavy edge work and high cutout counts add time β€” we tell you which day you are on at every stage, and nothing goes on the saw until you approve the layout.

  1. Day 1 Β· Showroom

    Tag your slab

    Walk the yard with a designer. Lock the edge profile, sink and cutouts, and leave with a written estimate.

  2. Day 2 Β· Your home

    Digital template

    We measure installed cabinets, not drawings. Sink and cooktop need to be on site.

  3. Day 3 Β· Shop

    Layout approval

    Your pieces are laid onto a photo of your actual slab. You see where the veining lands and where the seams fall before anything is cut.

  4. Days 4–8 Β· Floor

    Cut, edge, polish

    Breton machinery and waterjet cutting, then edge profiling and hand polish. Sink openings are shaped here, not improvised in your kitchen.

  5. Days 9–10 Β· Your home

    Set and walk

    Our own crews set the tops, join the seams and seal natural stone, then walk the job with you. We run five to ten installations a day, so your date does not depend on one truck being free.

Scope schedule

What the number covers, line by line

Countertop quotes go wrong when scope is vague. Here is the split, so you can compare us against anyone else item by item.

Countertop quote β€” included, priced separately, or not ours
Item Status Notes
On-site digital templatingIncludedMeasured from installed cabinets, not drawings
Slab layout for approvalIncludedSeam and vein placement shown before cutting
Sink and cooktop cutoutsIncludedShaped and finished in the shop
Edge profilesIncludedAll six profiles below carry no upcharge
Seam joiningIncludedColour-matched adhesive
First seal on natural stoneIncludedQuartz and porcelain do not need sealing
Delivery and installationIncludedOur own crews, not a subcontractor
Tear-out and disposal of old topsAdd-onWe do it β€” quoted as a separate line
Plumbing disconnect and reconnectAdd-onWe do it β€” quoted as a separate line
Backsplash tile settingAdd-onTile we install is covered by the same warranty
Cabinet levelling or reinforcementBy othersMust be sound and secured before templating
Electrical and gas at the cooktopBy othersLicensed trade required
Wall patch and paint after removalBy othersExpect touch-up behind old tops
Edge profiles β€” no upcharge on any of these
Profile Reads as
Pencil (eased)The quietest option β€” a barely softened square edge
Round OverA single soft radius, forgiving on a busy kitchen
Double Round OverRadius top and bottom, reads thicker and softer
BevelOne flat chamfer, crisp and modern
Double BevelChamfer top and bottom, more shadow line
OgeeThe traditional S-curve, at home with detailed cabinetry
Material schedule

Eight surfaces, one shop floor

Each one behaves differently under tooling. Quartz cannot take the heat natural stone shrugs off. Quartzite is hard enough to eat through blades. Porcelain chips if the feed rate is wrong. Running all of them for three decades is why the schedule holds.

Solid surface is where this shop started β€” we were the first certified Corian fabricator in Ohio, and still cut it for commercial and multi-family jobs.

Service area

Installing across Central Ohio

We fabricate for jobs across Ohio. The fastest turnaround sits inside about thirty miles of the shop on Bridgeway Avenue β€” close enough that template day and install day can be booked back to back.

ColumbusFranklin
DublinFranklin / Delaware
Upper ArlingtonFranklin
GahannaFranklin
New AlbanyFranklin / Licking
WestervilleFranklin / Delaware
PowellDelaware
HilliardFranklin
WorthingtonFranklin
PataskalaLicking
Grove CityFranklin
PickeringtonFairfield
Who we fabricate for

Homeowners and trade, on different terms

General notes

Straight answers about fabrication

Can you install countertops without seams?

Only if every run fits inside one slab. A slab arrives at a fixed size β€” the one drawn above is 126 by 63 inches β€” so a long L-shaped kitchen or a large island almost always needs at least one join.

What matters is where the seam goes. We place them where they are structurally sound and visually quiet, away from the middle of a sink cutout and where the pattern lets them disappear. You see the planned locations on your layout before we cut, and you can ask us to move them.

Do I need to be home for template day and install day?

Someone over eighteen has to let the crew in and be reachable for decisions on both. Templating takes an hour or two. Installation runs longer and is loud, so plan for the kitchen to be out of use.

What has to be ready before you can template?

Cabinets installed, level and secured β€” we measure what is in the room, not what is on the drawing. Sink, cooktop and faucet on site so cutouts match the real hardware.

Existing tops stay in place for templating. They have to come off before install day β€” we can tear them out and haul them away as a separate line on your quote, or you can handle it yourself.

Why does the estimate change after templating?

The showroom number uses your measurements. The template uses ours, and real cabinets are rarely square. Square footage can move a few feet either way, and an added cutout or edge detail shifts it further.

We reissue the estimate after templating, and nothing goes on the saw until you approve it.

Can I buy a slab without fabrication?

Yes. You can buy a slab outright from our inventory and take it to your own fabricator, or pick up finished tops from the shop rather than paying for delivery.

Walk the yard, tag what you want, and we will price it per square foot the same way it is listed online. Browse the slabs in stock.

What happens if something is wrong after installation?

Everything we install β€” countertops, cabinets, tile and sinks β€” carries a one year limited warranty against defects in materials and workmanship, running from the installation date. We repair or replace at our discretion, with no charge for labour or materials. The warranty covers the original purchaser and does not transfer with the house.

It does not cover scratches, burns or chips that happen after we leave, nor stains, water damage or misuse. Natural stone and wood vary in colour and texture by nature, so that variation is not treated as a defect either.

Tell us in writing within thirty days of spotting a problem, keep your proof of purchase, and let us come inspect it. The crew that built your tops is the crew that comes back. Read the full warranty.

Is there a minimum job size?

No. A single bathroom vanity is a real job here, and you are welcome to collect finished tops from the shop instead of paying for delivery.

For small pieces it is worth checking the remnant yard first β€” same shop, same fabrication, cut from what is left of full slabs at a lower price per square foot.

From the people we built for

Reviews from Central Ohio kitchens

4.7
β˜…β˜…β˜…β˜…β˜…
β˜…β˜…β˜…β˜…β˜…
Verified
Google (476 reviews)
Charles Pardi

Charles Pardi

4 weeks ago
G
β˜…β˜…β˜…β˜…β˜…
Thank you Distinctive for the great staff and professional job. Jonathan, Justin and Rick installed over 100 square feet of granite. Jonathan, the team leader is a perfectionist. He and Justin and Rick were great. Distinctive is fortunate to have this A team. I also want to give a shout out to Ron at Home Depot and Eric at Distinctive for perfect measurements. Thanks again Distintictive, Chuck. Ps: Jesus Christ loves you so much!!!
Mary McKay

Mary McKay

1 month ago
G
β˜…β˜…β˜…β˜…β˜…
Victor and Rick were very professional and respectful! They did a great job conveying each step as they installed our countertops. Explained the check list, and left everything as they found it! Distinctive can and should be proud of these two!! Happy with the install and all that it required.
Blue Kitchen Installation
Bruce B

Bruce B

9 months ago
G
β˜…β˜…β˜…β˜…β˜…
Distinctive Kitchen installed new quartz countertops and replaced the backsplash in our kitchen. We couldn't be more pleased with how the project went. Our salesman, Adam Poklar, was very helpful and patient with us during the quoting and material selection process. Replacing the cabinets was not in our budget but there was no pressure from Adam to convince us we should. He made suggestions for materials that gave us exactly the look we were after. The countertop installers were professional and did a good cleanup. The backsplash tiles were installed by Estaban who did an excellent job with extra attention to detail. Overall the workmanship was excellent and the price was considerably less than prices we received from two other contractors.
Quartz Countertop
Megan Hurley

Megan Hurley

1 month ago
G
β˜…β˜…β˜…β˜…β˜…
We are thrilled with the service we received and quality of our new countertops. Installed by John and Rick. Job#52159.
Kitchen Island
Lisa Dunn

Lisa Dunn

10 months ago
G
β˜…β˜…β˜…β˜…β˜…
Distinctive Kitchen traveled almost 2 hours to install a Hanstone quartz counter top in our new laundry room. Caleb & Kam were kind and very professional. They performed their work beautifully. Caleb explained to us how to keep the surface in great condition. We are very appreciative. We'll use Distinctive Kitchen again for any counter top needs.
Laundry Room Counter
Pamela Mertz

Pamela Mertz

2 months ago
G
β˜…β˜…β˜…β˜…β˜…
We had quartz countertops and backsplash installed. Ray and Paul installed our countertops then Kody, Jake and Rick came back to install our backsplash. It was long days but we are very pleased with the results. The teams worked so hard and made sure we were pleased with the outcome of both. Such a nice team of guys that know their craft. We will definitely share our experience. So refreshing to not have to deal with big box stores and contractors.
Backsplash Installation
Carol Bahr

Carol Bahr

8 months ago
G
β˜…β˜…β˜…β˜…β˜…
Distinctive Kitchen and Bath just installed new countertops in my master bathroom. My installers were Jon and Paul. They did a fantastic job. The worksite was left clean and the completed product looks beautiful.
Stephen C

Anthony Diaz

Jul 14, 2026
G
β˜…β˜…β˜…β˜…β˜…
SΓΊper happy with Distinctive! They do amazing work and very personal. It wasn’t only that they did an amazing work but it was personal and level headed, when a mishap happened, they didn’t hide it, they owned up fixed it better then new. It is actions like this that puts you in a category of your own. I appreciate the love and grace of the workmanship and i can wait to use them with my other clients.
All Reviews
Start the job

Bring rough measurements. Leave with a real number.

Approximate dimensions and a photo of the kitchen are enough to open an estimate. Walk the yard on the same visit and tag the slab you want.

Distinctive Kitchen
Columbus Β· Ohio Β· Est. 1994
4600 Bridgeway Avenue Columbus, OH 43219
(614) 431-0898
Mon–Fri 8:00 AM – 5:00 PM
Sat 9:00 AM – 3:00 PM Distinctive Surfaces, doing business as Distinctive Kitchen